WELL…WE DID IT!

It’s kind of surreal, and feels super weird, but we officially did it. We moved in to our (not so little) House on a Hill this weekend! 🎉🍾🥂 It’s hard to believe that the husband and I bought our first house less than a year ago with this crazy idea and here we are. It […]

Read More

COUNTER TOPS AND CABINET FRONTS ARE IN!

So I was going to wait until we installed the pulls to give you all a peek at the cabinets and our gorgeous new counter tops but I simply cannot wait any longer.  The counter tops have arrived and I am officially OBSESSED.  And did I mention that we installed the cabinet fronts too??   The husband and I still have a lot of work to do in the kitchen (install the toe-kick, attach all of the pulls, install the vent hood, trim the window, tile the back splash, install sconce over the sink/window, attach the island to the floor and finish the body of it, find a counter top for the island….the list keeps going trust me) but it is an incredible feeling to have the room that I’ve been dreaming about for so long finally start functioning as it should.

Read More

DOORS. DOORS. DOORS.

Since you got a sneak peek in my last post about the upstairs bath, I figured it was about time to talk about our doors. Doors are one of those things that the husband and I both had really strong feelings about…and luckily those feelings didn’t contradict each other.

Read More

UPSTAIRS BATH PART 2 – SHOWER WALLS

Well…that took longer than expected.  What the husband and I thought would be a weekend project of tiling the surrounding walls in our upstairs hall bath ended up taking about 7 nights…and I’m talking LATE nights.  But was it worth it?  AB-SO-LUTELY.  It was a really gratifying experience learning (well, teaching ourselves really based on […]

Read More

NICKEL SPACED WHAT?

One of the many DIY projects on our list was a shiplap wrapped fireplace.  If you read about our powder room you know that we installed actual tongue-and-groove shiplap on those walls, but this would be a bit different.  Since the vibe we’re going for in most of the house is kind of a mid-century […]

Read More

UPSTAIRS BATH PART 1 – THE FLOORS

So we’ve officially started working on finishing one of our full bathrooms so that we can start to nail down a move in timeline.  It’s crazy that this enormous project of ours is starting to wrap up and putting some of these finishing elements in is just making it all the more real.  Despite his […]

Read More

WE HAVE A BATHROOM!

Big things are happening at our (not so Little) House on the Hill and it’s made for a super crazy couple of weeks.  We’ve built and installed the IKEA kitchen cabinet boxes, shiplapped (that’s a word, right?) the fireplace, installed a few light fixtures, ordered and had doors and trim delivered, tiled the upstairs hall […]

Read More